snx

By |2018-10-11T12:22:44+00:00October 6th, 2018|Transportation & Installation|

PROJECT: NEMBA Stage 2 (SNX) PROJECT - 2013 CUSTOMERS SCOPE OF WORK Detailed Engineering Stage Transportation Analysis of Deck, Flare and Bridge on Hawk HTV vessel Stability Analysis Strength & Fatigue of all structures SPECIFICS Deck Weight 18200 Kips Structural model of the vessel considered Concerns about structural

s7000

By |2018-10-11T12:25:52+00:00October 6th, 2018|Transportation & Installation|

PROJECT: WESTERN LIBYA GAS PROJECT - 2004 CUSTOMERS SCOPE OF WORK Lowering of PMS with S7000 crane barge Check of slackness in the slings Evaluate load in protective hatches SPECIFICS Lowering thru the splash zone Time domain simulation

nrpod

By |2018-10-11T12:27:41+00:00October 6th, 2018|Mooring|

PROJECT: BGEPIL NRPOD TAPTI EXPANSION PROJECT - 2006 CUSTOMERS SCOPE OF WORK Mooring Analysis Check validity of mooring pattern during laying of 20" Export Gas Pipeline and 20" Infield Gas Pipeline Global's Derrick Lay Barge 264 SPECIFICS Frequency domain analysis, wave, current and wind Pipe is considered in

T&I Yoho Piggyback

By |2018-10-11T12:53:56+00:00October 1st, 2018|Transportation & Installation|

PROJECT: YOHO DEVELOPMENT PROJECT - 2004 CUSTOMERS SCOPE OF WORK Detailed Design Stage Transportation Analysis of deck YP Deck loaded and fastened on top of cargo barge S45 The whole ensemble is loaded on top of the Blue Marlin vessel in Piggy Back configuration Strength and fatigue analysis of

T&I Lowering KUITO2

By |2018-10-11T12:39:45+00:00September 30th, 2018|Transportation & Installation|

PROJECT: KUITO FPSO INSTALLATION PROJECT - 2002 CUSTOMERS SCOPE OF WORK Basic Design Stage Lifting of a module on top of KUITO FPSO using Castoro 8 crane barge Mooring design of the Castoro 8 alongside the FPSO. Check of offsets to validate the use of a gangway between the

Pipelying PMS

By |2018-10-11T12:40:38+00:00September 30th, 2018|pipelaying|

PROJECT: DEKA OFFSHORE DEVELOPMENT PROJECT - 2013 CUSTOMERS SCOPE OF WORK Detailed Engineering Stage Stinger structural analysis during 16" subsea pipeline installation operation with PMS-12 pipelay vessel Articulated 55+25m and 80m stingers SPECIFICS time domain simulations Structural load case defined for each time event of the simulation for

Pipelying Punj Llyod

By |2019-11-22T13:35:07+00:00September 30th, 2018|pipelaying|

PROJECT: MAHESH - 1 STINGER PROJECT - 2012 CUSTOMERS SCOPE OF WORK Detailed Engineering Stage Stinger Structural Analysis during Pipelaying SPECIFICS Operating, maintenance and stand-by configurations Stinger is self-floating with floodable compartments. 3D hydrodynamic is considered for the stinger compartments and hydrodynamic loads are mapped to the structural

Mooring Flotel Girassol

By |2018-10-11T12:46:47+00:00September 30th, 2018|Mooring|

PROJECT: FLOTEL GIRASSOL - 2000 CUSTOMERS SCOPE OF WORK Detailed Engineering Stage Flotel Barge Bos300 moored alongside Girassol FPSO Design of berthing lines and fenders to minimize relative motions between the 2 vessels Study of different phases (standby and on-location) under environments Check of berthing lines, mooring lines and

T&I Marlin

By |2018-10-11T12:30:54+00:00September 29th, 2018|Transportation & Installation|

PROJECT: MARLIN DEVELOPMENT PROJECT - 2013 CUSTOMERS SCOPE OF WORK Detailed Engineering Stage Strength and fatigue Analysis during transportation of Jacket WP1 on H404 barge SPECIFICS Vessel structure is considered in the analysis Frequency domain analysis

T&I Mopustor

By |2018-10-11T12:47:23+00:00September 29th, 2018|Transportation & Installation|

PROJECT: YME FIELD - MOPU INSTALLATION PROJECT - 2008 CUSTOMERS SCOPE OF WORK Installation Design Design the installation steps to assemble the MOPU (11785 T) to the gravity base Simulation of the positionning of the MOPU above the base Lowering of the legs into the sleeves SPECIFICS Time