PROJECT
SPUD CAN INSPECTIONS – 2008 & 2013
CLIENT
SCOPE OF WORK
Detailed Design Stages
- Support of Jackup on one or two barges for spud can inspection operation
- Structural verification of the jackup hull and barges
SPECIFICS
- Consider a simplified structural model for the jackup and barges
- Model the jackup with legs as separated parts of the body jackup so that their elevation can be modified independantly
- Compression only connectors are located betwen the barges and the jackup hull
- Static analysis
- Done in partnership with GPMC