PROJECT

XLP PROJECT – 2019

CLIENT

SCOPE OF WORK

Feasibility study of the installation of XLP floating production platform concept

  • Assembly of the different parts
  • Equilibrium configurations during ballasting sequence
  • Setup of different connections

SPECIFICS

  • The X-Leg design is capable of being transitioned from the horizontal (transit) position to the vertical and subsequent operating positions simply by ballasting
  • No vessel assistance needed for installation