T&I DORIS GALLAF Upending

By |2019-04-11T10:11:01+00:00April 11th, 2019|Transportation & Installation|

PROJECT: GALLAF Batch 2 FEED PROJECT - 2019 CUSTOMERS SCOPE OF WORK FEED Stage Upending of jackets CE & EH (1634 & 1745 T) SPECIFICS Single block and double block operations are simulated Simulation is done as a succession of controled ballast and hook liftind/lowering At this stage,

T&I Idemitsu

By |2018-10-11T12:18:56+00:00October 10th, 2018|Transportation & Installation|

PROJECT: SAO VANG AND DAI NGUYET DEVELOPMENT PROJECT - 2016-2017 CUSTOMERS SCOPE OF WORK FEED Stage CPP-SV process deck, transportation & floatover mating analyses DN-WHP Wellhead deck, transportation analysis SV (12060 T) & DN (5920 T) jackets, transportation and launch analyses SPECIFICS Barge feasibility studies LMU, DSU and

Polar Pod

By |2018-10-11T12:21:53+00:00October 10th, 2018|special projects|

PROJECT: POLAR POD PROJECT - 2015 CUSTOMERS SCOPE OF WORK Basic Design Stage Checking structural integrity of the steel truss under extreme environmental loads and cyclic loads (fatigue) Vertical and horizontal positions are considered SPECIFICS The model contains both hull shape and trusses Hydrodynamic loads on the hull

mooring Malikai

By |2019-01-29T09:07:02+00:00October 10th, 2018|Mooring|

PROJECT: MALIKAI PROJECT - 2015 TENDER ASSISTED DRILLING ACTIVE WINCHING STUDY DYNAMIC MOORING MAKE-UP ANALYSIS CUSTOMERS SCOPE OF WORK Detailed Design Stage Adjust the mooring lines first segment length as such as each well slot on the TLP is centered directly above the corresponding subsea wellhead within some defined allowable

Mooring Gryphon

By |2019-04-12T13:39:17+00:00October 9th, 2018|Mooring|

PROJECT: MDA-MBH FPU PRODUCTION BARGE PROJECT - 2015 MOTION AND MOORING STUDY CUSTOMERS SCOPE OF WORK Bid Engineering Stage Motion study for operating and storm environments Mooring study of production barge for extreme environment (100 yr return period) SPECIFICS Demonstrate and establish preferred operating draft for FPU unit