PROJECT
MDA-MBH FPU PRODUCTION BARGE PROJECT – 2015
MOTION AND MOORING STUDY
CLIENTS
SCOPE OF WORK
Bid Engineering Stage
- Motion study for operating and storm environments
- Mooring study of production barge for extreme environment (100 yr return period)
SPECIFICS
- Demonstrate and establish preferred operating draft for FPU unit
- Study is aimed to establish the forces/loads on mooring lines and specify indicative mooring line charateristics at this AIP stage.
- Loads on mooring piles are also established
- Time domain simulations including damage cases
- Done in partnership with GPMC