PROJECT
AZERI CENTRAL EAST PROJECT – 2019-2023
SCOPE OF WORK
Installation Engineering Stage
- Independant modelling of launch barge, crane vessel, jacket and topside
- Jacket and Topside transport stability and motion analyses
- Jacket launch simulations
- Jacket docking procedure design, static and dynamic simulations
- Jacket on-bottom stability analyses
- Skirt Pile, upending, lifting and impact analyses during installation
- Floatation Tank removal and towing analyses
- Topside float-over and mating analyses
- Mooring analyses prior to mating
- Advise operational procedures
SPECIFICS
- Caspian Sea in 137 m water depth
- 8 legs, 15000 mT Jacket
- 2 massive Floatation Tanks
- 21000 mT Topside
- Transportation and launch with STB-1 barge
- Lifting with DBA Crane vessel
- Done in partnership with ORCA-OFFSHORE