PROJECT

GUINARD ENERGY PROJECT – 2017

CLIENT

ship st e

SCOPE OF WORK

Detailed Design Stage

  • Stability calculations during ballasting operation
  • Ballasting and deballasting procedures

SPECIFICS

  • Study done as a succession of equilibrium positions and also in time domain
  • Air pressure is taken into account in the ballasting of the compartments
  • Vents and flood valves are considered in the model at the correct location