PROJECT

SHAH DENIZ 2 – PIPELAYING ANALYSIS – 2008

CLIENTS

bp Saipem Logo e

SCOPE OF WORK

T&I Stage

  • Dynamic pipelaying analysis of 16″ pipe
  • Articulated stinger with Pipe Lay Barge Guseinov
  • Get dynamic loads on stinger and find allowable sea-states
  • Get stress in pipe

SPECIFICS

  • Time domain simulations
  • Water depth is 580 m
  • Structural model of the stinger imported from SACS
  • Stinger made of 2 articulated parts, one being fitted with ballast tanks to adjust trim