PROJECT
YOHO DEVELOPMENT PROJECT – 2004
CLIENTS
SCOPE OF WORK
Detailed Design Stage
- Transportation Analysis of deck YP
- Deck loaded and fastened on top of cargo barge S45
- The whole ensemble is loaded on top of the Blue Marlin vessel in Piggy Back configuration
- Strength and fatigue analysis of the deck YP
- Transportation analysis of the deck YQ (YQ) and the living quarters (LQ) on board the cargo barge BOA28, including stability check, extreme motions and minimum bollard pull analyses
SPECIFICS
- The deck is restrained by means of skid shoes and diagonal tiedowns
- The two vessels are modeled structurally to account for flexibility
- The S45 barge is restrained to the Blue Marlin using springs in the vertical direction along with horizontal springs located at the transverse bulkheads