PROJECT
FLOTEL GIRASSOL – 2000
CLIENTS
SCOPE OF WORK
Detailed Engineering Stage
- Flotel Barge Bos300 moored alongside Girassol FPSO
- Design of berthing lines and fenders to minimize relative motions between the 2 vessels
- Study of different phases (standby and on-location) under environments
- Check of berthing lines, mooring lines and fenders
SPECIFICS
- Time domain simulations
- Use of polypropylene lines
- Use of pulley systems
- Fenders modeled as compression only connectors