mooring girassol
mooring girassol
mooring girassol
mooring girassol
mooring girassol mooring girassol mooring girassol mooring girassol

PROJECT

FLOTEL GIRASSOL – 2000

CLIENTS

SCOPE OF WORK

Detailed Engineering Stage

  • Flotel Barge Bos300 moored alongside Girassol FPSO
  • Design of berthing lines and fenders to minimize relative motions between the 2 vessels
  • Study of different phases (standby and on-location) under environments
  • Check of berthing lines, mooring lines and fenders

SPECIFICS

  • Time domain simulations
  • Use of polypropylene lines
  • Use of pulley systems
  • Fenders modeled as compression only connectors