PROJECT

MAHESH – 1 STINGER PROJECT – 2012

CLIENT

punj llyod

SCOPE OF WORK

Detailed Engineering Stage

  • Stinger Structural Analysis during Pipelaying

SPECIFICS

  • Operating, maintenance and stand-by configurations
  • Stinger is self-floating with floodable compartments. 3D hydrodynamic is considered for the stinger compartments and hydrodynamic loads are mapped to the structural nodes of the stinger
  • Constant tension in the stinger support cables / fixed lengths
  • 12″ & 44″ pipes included in the model as a connector that responds dynamically, tensioned at one end and laying on barge and stinger rollers
    Done in partnership with GPMC