Transportation & Installation

T&I DORIS GALLAF Upending

By |2019-04-11T10:11:01+00:00April 11th, 2019|Transportation & Installation|

PROJECT: GALLAF Batch 2 FEED PROJECT - 2019 CUSTOMERS SCOPE OF WORK FEED Stage Upending of jackets CE & EH (1634 & 1745 T) SPECIFICS Single block and double block operations are simulated Simulation is done as a succession of controled ballast and hook liftind/lowering At this stage,

T&I Idemitsu

By |2018-10-11T12:18:56+00:00October 10th, 2018|Transportation & Installation|

PROJECT: SAO VANG AND DAI NGUYET DEVELOPMENT PROJECT - 2016-2017 CUSTOMERS SCOPE OF WORK FEED Stage CPP-SV process deck, transportation & floatover mating analyses DN-WHP Wellhead deck, transportation analysis SV (12060 T) & DN (5920 T) jackets, transportation and launch analyses SPECIFICS Barge feasibility studies LMU, DSU and

snx

By |2018-10-11T12:22:44+00:00October 6th, 2018|Transportation & Installation|

PROJECT: NEMBA Stage 2 (SNX) PROJECT - 2013 CUSTOMERS SCOPE OF WORK Detailed Engineering Stage Transportation Analysis of Deck, Flare and Bridge on Hawk HTV vessel Stability Analysis Strength & Fatigue of all structures SPECIFICS Deck Weight 18200 Kips Structural model of the vessel considered Concerns about structural

s7000

By |2018-10-11T12:25:52+00:00October 6th, 2018|Transportation & Installation|

PROJECT: WESTERN LIBYA GAS PROJECT - 2004 CUSTOMERS SCOPE OF WORK Lowering of PMS with S7000 crane barge Check of slackness in the slings Evaluate load in protective hatches SPECIFICS Lowering thru the splash zone Time domain simulation

T&I Yoho Piggyback

By |2018-10-11T12:53:56+00:00October 1st, 2018|Transportation & Installation|

PROJECT: YOHO DEVELOPMENT PROJECT - 2004 CUSTOMERS SCOPE OF WORK Detailed Design Stage Transportation Analysis of deck YP Deck loaded and fastened on top of cargo barge S45 The whole ensemble is loaded on top of the Blue Marlin vessel in Piggy Back configuration Strength and fatigue analysis of

T&I Lowering KUITO2

By |2018-10-11T12:39:45+00:00September 30th, 2018|Transportation & Installation|

PROJECT: KUITO FPSO INSTALLATION PROJECT - 2002 CUSTOMERS SCOPE OF WORK Basic Design Stage Lifting of a module on top of KUITO FPSO using Castoro 8 crane barge Mooring design of the Castoro 8 alongside the FPSO. Check of offsets to validate the use of a gangway between the

T&I Marlin

By |2018-10-11T12:30:54+00:00September 29th, 2018|Transportation & Installation|

PROJECT: MARLIN DEVELOPMENT PROJECT - 2013 CUSTOMERS SCOPE OF WORK Detailed Engineering Stage Strength and fatigue Analysis during transportation of Jacket WP1 on H404 barge SPECIFICS Vessel structure is considered in the analysis Frequency domain analysis

T&I Mopustor

By |2018-10-11T12:47:23+00:00September 29th, 2018|Transportation & Installation|

PROJECT: YME FIELD - MOPU INSTALLATION PROJECT - 2008 CUSTOMERS SCOPE OF WORK Installation Design Design the installation steps to assemble the MOPU (11785 T) to the gravity base Simulation of the positionning of the MOPU above the base Lowering of the legs into the sleeves SPECIFICS Time

T&I Bokor floatover

By |2018-10-11T12:49:40+00:00September 28th, 2018|Transportation & Installation|

PROJECT: 2011 BARAM DELTA EOR PSC DEVELOPMENT PROJECT - 2015 CUSTOMERS SCOPE OF WORK FEED Stage Floatover Mating BOCPP Topside SPECIFICS Barge feasibility studies LMU, DSU and fender specifications Equipment specifications Floatover KG curves Done in cooperation with GPMC