pipelaying

Pipelying PMS

By |2018-10-11T12:40:38+00:00September 30th, 2018|pipelaying|

PROJECT: DEKA OFFSHORE DEVELOPMENT PROJECT - 2013 CUSTOMERS SCOPE OF WORK Detailed Engineering Stage Stinger structural analysis during 16" subsea pipeline installation operation with PMS-12 pipelay vessel Articulated 55+25m and 80m stingers SPECIFICS time domain simulations Structural load case defined for each time event of the simulation for

Pipelying Punj Llyod

By |2019-11-22T13:35:07+00:00September 30th, 2018|pipelaying|

PROJECT: MAHESH - 1 STINGER PROJECT - 2012 CUSTOMERS SCOPE OF WORK Detailed Engineering Stage Stinger Structural Analysis during Pipelaying SPECIFICS Operating, maintenance and stand-by configurations Stinger is self-floating with floodable compartments. 3D hydrodynamic is considered for the stinger compartments and hydrodynamic loads are mapped to the structural